Planning Dump Truck Capacity for a Construction Project
How to think about dump truck capacity and load planning when preparing a hauling request.
Updated September 1, 2025
Capacity and loads
Dump truck capacity determines how many loads a project requires. A quad-axle dump truck carries more per load than a smaller truck, which can reduce the total number of trips for a given volume.
When planning, estimate the total volume of material and divide by an approximate per-load capacity. The result is a rough load count you can include in your hauling request.
When you're not sure
If you're not sure how many trucks or loads you need, describe what you're moving and the volume involved. A hauling company can often help assess the requirement as part of reviewing the request.
Include the project duration and schedule so the hauling company can review whether the load plan fits the timeline.
Ready to request dump trucks?
Submit your project details and an ORINAJO representative will review the request.
REQUEST DUMP TRUCKS
